As per the Project risk/return matrix,projects that are poor candidates have a


A) low risk factor and low return factor.
B) high risk factor and low return factor.
C) low risk factor and high return factor.
D) high risk factor and high return factor.

E) A) and C)
F) A) and D)

Correct Answer

verifed

verified

Tasks on the critical path with no slack are known as ________.

Correct Answer

verifed

verified

A sequence of activities that leads from the starting node to the finishing node is called a


A) path.
B) trail.
C) slack.
D) timeline.

E) None of the above
F) B) and C)

Correct Answer

verifed

verified

A task in a project which is a critical task should be chosen for crashing.

A) True
B) False

Correct Answer

verifed

verified

The shortest time for completing a project task is known as ________.

Correct Answer

verifed

verified

optimistic...

View Answer

Integrated change control is a key activity during the monitoring and controlling phase of a project.

A) True
B) False

Correct Answer

verifed

verified

The act of determining which tasks precede and follow other tasks is known as ________.

Correct Answer

verifed

verified

It has been estimated that the mean time required to complete a project is 20 weeks and the variance of project completion time is 9 weeks.So there is a 50% chance that the project can be completed in


A) 10 weeks.
B) 19 weeks.
C) 20 weeks.
D) 26 weeks.

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

Integrated change control is a key activity during which phase of a project?


A) Initiation
B) Planning
C) Executing
D) Monitoring and controlling

E) A) and B)
F) B) and D)

Correct Answer

verifed

verified

If two consecutive tasks on the same path each have two days of slack,this means that each of them can be delayed by two days without delaying the project.

A) True
B) False

Correct Answer

verifed

verified

Following are the three time estimates for a task in a project: optimistic completion time = 2 weeks Most likely completion time = 4 weeks Pessimistic completion time = 7 weeks Compute the expected time for the task.


A) 3.5 weeks
B) 4.167 weeks
C) 5.23 weeks
D) 5.75 weeks

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Developing a road map for the project is known as ________.

Correct Answer

verifed

verified

The phase of the project in which the rate of spending typically increases is the


A) initiation phase.
B) planning phase.
C) execution and controlling phase.
D) closure phase.

E) All of the above
F) C) and D)

Correct Answer

verifed

verified

Developing the project management plan is a key activity during which phase of a project?


A) Initiation
B) Planning
C) Executing
D) Monitoring and controlling

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

As per Belbin,a person who has the strengths of being an extrovert,enthusiastic,communicative and someone who explores opportunities and develops contacts is ideal for the project team role of


A) shaper.
B) implementer.
C) coordinator.
D) resource investigator.

E) A) and B)
F) B) and D)

Correct Answer

verifed

verified

________ is a term applied to the process of managing changes to the project charter and plan.

Correct Answer

verifed

verified

The process of reporting to see that the project plan is being followed is known as ________.

Correct Answer

verifed

verified

monitoring...

View Answer

The latest starting time for a task is equal to the latest finish time minus the task time.

A) True
B) False

Correct Answer

verifed

verified

The method for planning projects that uses shortest paths is called ________.

Correct Answer

verifed

verified

critical p...

View Answer

The difference between the latest possible completion time and the earliest possible completion time for a project task is known as ________.

Correct Answer

verifed

verified